Scenario:
When you need to change the overall final materiality on the leadsheets.
Answer:
Note:
-
Ensure that all the lead sheets are closed before making any changes to the evaluation of misstatements(02.40).
-
Changes made on other documents like 02.40 affect other scripts that need to be updated before you can open the leadsheets.
-
Open document 02.40 Evaluation of misstatements and override the ‘overall materiality set during the planning stage’ and click on ‘save’.
![image.png](/servlet/rtaImage?eid=kaB5I0000008OsI&feoid=00N0J00000AXpyr&refid=0EM5I0000058r4Y)
2. Open document 10.60 Overall materiality assessment, to refresh the changes made on document 02.40 (to update the scripts).
![image.png](/servlet/rtaImage?eid=kaB5I0000008OsI&feoid=00N0J00000AXpyr&refid=0EM5I0000058qnJ)
3. Open the lead sheets, and note that the amount changed.
![image.png](/servlet/rtaImage?eid=kaB5I0000008OsI&feoid=00N0J00000AXpyr&refid=0EM5I0000058r5W)
Rate this article:
|vote=None|
Processing...
(Popularity = 0/100, Rating = 0.0/5)
Related Articles
Audit International | 09 Materiality
Probe | Amounts not pulling through or pulling through incorrectly
CaseWare Working Papers | Introduction to Leadsheets
Audit International | 10 Materiality assignment FSA
view all...